Case Studies

Stena Line Case Study Thumbnail

Messagemaker Displays Balfour Beatty Case Study

Hammerwich Case Study from Messagemaker Displays

Location:  Fishguard and Holyhead

Products: Trailer unit , Tower unit

With various post-Brexit challenges impacting the travel industry, Stena Line required new signage to relay instructions to passengers navigating in and around two ports: Fishguard and Holyhead. Messagemaker Displays Key Account Manager, Andy Norman, describes the project.

Location:  Banwell, North Somerset

Product:  Bespoke VAS Wig Wag sign 

The site of works for the new Mendip Cabling Project required an automatically activated signage system that could be used to alert motorists of the temporary traffic lights up ahead on the road. Messagemaker Displays worked with Balfour Beatty on a new Bespoke signage solution.

Location: Hammerwich

Product: Smiley Activated Message (SAM)

Motorists were entering from the M6 toll road and the A5 dual carriageway at high speeds in Hammerwich. The installation of a Messagemaker SAM sign helped reduce high speeds and potentially save lives.

VVB Case Study from Messagemaker Displays

Messagemaker Displays Case study: supporting safer routes to school across Wales

Location: A470 North Road in Cardiff

Products: Lane Control Signs

The team at Messagemaker Displays was contacted to provide a new tidal flow solution along the A470 North Road in Cardiff. Our signs were reverse-engineered to replace the old Thermotor Lane Control Signs whilst maintaining integration with the existing UTC control system.

Location: Wales 

Product:  Highways Approved VAS

In 2015 the Welsh Government announced a new policy to make routes to schools safer, especially those located on a trunk road. The key focus of the scheme was to create part-time 20mph speed limits around schools.